Work is well underway in Millbay Boulevard, which has included the installation of district energy pipework by South West Highways, over 250m of its length, to provide low carbon renewable heating and cooling to a range of existing and new buildings.
A heat pump is also proposed for Ballard House, the council’s main building, which can be connected to this network in the future. The network can utilise groundwater and/or seawater as the source for heating or cooling buildings.
Please note – this was published when Labour controlled Plymouth City Council between 2018-2021.